Using the ADD command listed at the bottom of the screen, you can now add the missing resources to the Control-M Resources file.
The Add Resources window is displayed.
Figure 32 Add Resources Window in IOA Conditions/Resources Screen
-------------------------- IOA CONDITIONS/RESOURCES ------------------------(4)  COMMAN +---------------------------------------------------------+  L ===> CRSRPREFIX |  PLEASE FILL IN QUANT RES NAME, COUNT AND PRESS ENTER   |  0202 - 0202OPT TY |                                                         |  BA    DATE    CO |  NAME ===> IDTAPE-DRIVE             COUNT ===>   0001   |        0202====== |                                                         |  << ========       +---------------------------------------------------------+            
The window is closed and the resource is added to the Control-M Resources list in the specified quantity.
The IOA Conditions/Resources screen now contains the required condition and the necessary quantities of the required resources.
-------------------------- IOA CONDITIONS/RESOURCES ------------------------(4)
COMMAND ===>                                                   SCROLL ===> CRSR
PREFIX  ===> ID             COND Y CONTROL Y RES Y STAT N      DATE 0202 - 0202
OPT TYPE      CONDITION/RESOURCE    IOAID  USE QUANTITY  MAX  *P   RBA    DATE
    RESOURCE  IDCPOWER                      B    0005    0005                 
    RESOURCE  IDTAPE-DRIVE                  B    0001    0001                 
    COND      IDJOB3-ENDED-OK                                             0202
======== >>>>>>>>>>>>>>>> B O T T O M   O F   L I S T <<<<<<<<<<<<<<<< ========
Note that the condition you added from the Why screen could have instead been added using the ADD command in the IOA Conditions/Resources screen. In this case, the command would have been ADD CONDITION instead of ADD RESOURCE. A Control resource can be add using the command ADD CONTROL.
Note also, in accordance with the instruction line at the bottom of the screen, that the IOA Conditions/Resources screen permits the deletion of resources and conditions.
Parent Topic |