Due to differences in the time of the start of the new working day, shift the scheduling of the following converted job back to the previous day.
Figure 297 SAC Parameter Example
JOB: CAPRKL1  LIB CTM.PROD.SCHEDULE                   TABLE: PRODKPL
COMMAND ===>                                         SCROLL===> CRSR
+------------------------------------------------------------------+
  DOCMEM  IEFBR14     DOCLIB   CTMP.DOC                            
  ==================================================================
  DAYS    ALL                                           DCAL        
                                                              AND/OR 
  WDAYS                                                 WCAL        
MONTHS 1- Y 2- Y 3- Y 4- Y 5- Y 6- Y 7- Y 8- Y 9- Y 10- Y 11- Y 12-Y
  DATES                                                             
  CONFCAL          SHIFT       RETRO N MAXWAIT 04  D-CAT            
  MINIMUM          PDS                                              
  DEFINITION ACTIVE FROM          UNTIL                             
  ==================================================================
  IN                                                                
  CONTROL  MK-1                 E                                   
  RESOURCE                                                          
  PIPE                                                              
  FROM TIME         +     DAYS    UNTIL TIME      +     DAYS  
  DUE OUT TIME      +     DAYS    PRIORITY     SAC P  CONFIRM 
  TIME ZONE:                                                        
  ==================================================================
  OUT      COND1                ODAT +    COND2        ODAT -       
           COND3                ODAT +    COND4        ODAT -       
 COMMANDS: EDIT, DOC, PLAN, JOBSTAT                         15.24.05