DATES Example 1
Schedule a job for the 15th of January (mmdd format).
DATES 0115  | 
DATES Example 2
Schedule job PRDKPL01 for the 21st of June and the 21st of December (ddmm format).
Figure 169 DATES Parameter Example
JOB: PRDKPL01 LIB CTM.PROD.SCHEDULE                    TABLE: PRODKPL
COMMAND ===>                                          SCROLL===> CRSR
+-------------------------------------------------------------------+
  MEMNAME PRDKPL01    MEMLIB   CTM.PROD.JCL                          
  OWNER   SYS1        TASKTYPE JOB    PREVENT-NCT2   DFLT  N         
  APPL    KPL                         GROUP PROD-KPL                 
  DESC    DAILY PRODUCTION - START OF APPL-PROD-KPL                  
  OVERLIB                                                 STAT CAL   
  SCHENV                         SYSTEM ID                NJE NODE   
  SET VAR                                                            
  CTB STEP AT         NAME            TYPE                           
  DOCMEM  PRDKPL01    DOCLIB   CTM.PROD.DOC                          
  ===================================================================
SCHEDULE RBC                                                         
RELATIONSHIP (AND/OR) O                                              
DAYS                                                         DCAL    
                                                             AND/OR  
WDAYS                                                        WCAL    
MONTHS 1- Y 2- Y 3- Y 4- Y 5- Y 6- Y 7- Y 8- Y 9- Y 10- Y 11- Y 12- Y
DATES 2106 2112                                                      
CONFCAL          SHIFT       RETRO N MAXWAIT 04   D-CAT              
MINIMUM    PDS  
DEFINITION ACTIVE FROM UNTIL
  ===================================================================
  IN       START-DAILY-PROD-KPL ODAT                                 
 COMMANDS: EDIT, DOC, PLAN, JOBSTAT                          11.17.00
Parent Topic |