The following table describes the fields to adjust the quantitative resource at a specified time.
| Field | Description | 
|---|---|
| Update quantitative resource maximum quantity | |
| Control-M | Name of the Control-M whose jobs are included in this exception definition. | 
| Resource | Modifies the quantitative resource, which represents a measure that can be quantified. | 
| Maximum | Modifies the maximum quantity of this quantitative resource that can be used by jobs concurrently according to one of the following settings: 
 | 
| At (Sets when the event is triggered) | |
| New Day time | The time that the New day procedure is scheduled to run. | 
| Time | Time of day at which the job starts, specified in hours and minutes using the 24-hour clock format (HH:MM). This is based on the time of the Control-M on which the job is run. | 
| Calendar details (click Advanced) Applies to Service Assumption and Forecast/SLA Management rules | |
| Calendar | Details of the Control-M and calendar to be used to schedule the job. | 
| Period | Name of one or more period for this exception definition, which can be selected from a list. Special month rules are not supported. | 