The following table lists the job run time estimation information:
| Icon | Description | 
|---|---|
| 
 | No previous time statistics exist for the job. The job is waiting for BIM's calculations. | 
| 
 | Estimation based on BIM's calculation or statistics. | 
| 
 | Job start time based on BIM statistics has passed and the job did not run. | 
| 
 | Estimation based on statistics of the average run time that is displayed on the job. | 
| Parent Topic |