This procedure describes how to connect jobs in the flow diagram.
Before you begin
Ensure you have met the following requirements:
 drop-down is set to Show Dependencies behind Hosts or Show Dependencies above Hosts.
 drop-down is set to Show Dependencies behind Hosts or Show Dependencies above Hosts.To connect jobs:
The Condition triangle appears at the bottom of the job.

 
    
There is a dotted line drawn during the drag and drop. After the drop, the line is solid, depending on your Map settings.
 .
.The dependent job (second) is dependent on the predecessor job (first).