Integrating Workload Change Manager with a change management system
This procedure describes how to integrate Workload Change Manager with a change management system.
To in
- Prepare the dedicated REST server or the change management system to receive the API endpoints, as described in Workload Change Manager API endpoints.
- Test the API endpoints with Postman or any HTTP connector.
- (Optional) Configuring secure communication between Control-M Workload Change Manager and an change manager system
- Configure Control-M with the new endpoint parameters, as described in Control-M Workload Change Manager system parameters.