Integrating Workload Change Manager with a change management system

This procedure describes how to integrate Workload Change Manager with a change management system.

To in

  1. Prepare the dedicated REST server or the change management system to receive the API endpoints, as described in Workload Change Manager API endpoints.
  2. Test the API endpoints with Postman or any HTTP connector.
  3. (Optional) Configuring secure communication between Control-M Workload Change Manager and an change manager system
  4. Configure Control-M with the new endpoint parameters, as described in Control-M Workload Change Manager system parameters.

Parent Topic

Workload Change Manager integration with a change management system